Outbuilding (Class E)
No permission needed
Likely permitted development, so no planning application
What to do next
To have it confirmed in writing, apply for a Lawful Development Certificate.
Things to watch
- If your home was created using permitted development rights, such as a barn, office or shop converted without planning permission, it doesn't have these rights, so you'll need planning permission. Your council can tell you how it was approved.(Class E.1(a))
Conditions that apply (2)Raised platforms, Use.
- Decking, a verandah or a platform more than 30cm above the ground isn't permitted development, so plan any deck around the building lower than that.(Class E.1(h))
- It must be used for things incidental to the house, like an office, gym or workshop. Not as a bedroom or a separate home.
Rule checks
All 7 rule checks passed
- Height within 2m of boundary2.5m vs 2.5m max (1m from boundary)
- Eaves height2.3m vs 2.5m max
- Covers ≤ half the garden17.5m² of 235m² garden (7.4%)
- Not in front of the houseLocated behind the front wall
- Not a listed buildingNo listing recorded
- No Article 4 DirectionNone recorded
- Not in a protected areaNone recorded
Was this right?
The most you can build
The most you can build without an application: length 12.9m, width 9m, 116.1m² floor area.
Yours is 5m by 3.5m.
Over 30 m², it needs Building Regulations approval. A building this big must still only be used for things incidental to the house, such as a home office or a gym, and councils look closely at large ones.
What your project will cost
Sign in, free, to see build costs at your region’s rates, the saving from doing some of the work yourself, an all-in budget, and whether it’s likely to add value to your home.
Building Regulations
Separate from planning, and needed whether or not you apply for permission. Nothing here needs action.
- GeneralLikely exempt
With no sleeping accommodation, a garden building under 15m², or 15–30m² at least 1m from every boundary or built mostly from non-combustible materials, is usually exempt from Building Regulations.
Your neighbours
Under the Party Wall etc. Act 1996 you must give your neighbours written notice before this work.
Notice of adjacent excavation (section 6, at least 1 month’s notice)check if needed
Needed only if a neighbour's building is within 3m and your foundations go deeper than its foundations. Ground screws or a shallow base usually don't.
PlanItClear is free while we launch. If it saved you a fee, you can support us.
Support PlanItClearPlanItClear is a screening tool, not legal advice. Check with your council, or get a Lawful Development Certificate, before you build. Costs are rough ranges. Data sources and licences. Report a problem with this result.
Which rules are checked
In England, the GPDO 2015 Schedule 2, Part 1 Classes A to E and Part 14 Class A, as amended to 27 August 2026. In Wales, the GPDO 1995 as it applies in Wales, Part 1 Classes A to E and Part 40 Class A. In Scotland, the GPDO (Scotland) 1992, Part 1 Classes 1A to 3A and Part 1A Class 6HA. In Northern Ireland, the GPDO (NI) 2015, Part 1 Classes A to D and Part 2 Classes A and B.