How it works

We check your design against the permitted development rules for your part of the UK, then show the costs and what to do next. Here’s how we reach our answers, and where our limits are.

What the verdicts mean

  • No permission needed

    Your design meets every rule checked, so you're unlikely to need planning permission. A Lawful Development Certificate gives you proof if you want it.

  • Allowed with conditions

    Your design is likely allowed, but something about your home adds limits or needs checking, such as a conservation area. Check with your council.

  • Prior approval needed

    You don't need full planning permission, but you must tell the council first and wait for its approval. Larger single-storey rear extensions in England are an example.

  • Planning permission needed

    At least one rule isn't met, so you'll likely need to apply for planning permission. The checker shows which rules, and the most you can build without permission.

Which rules are checked

The rules come from each nation’s General Permitted Development Order, as amended to 21 October 2026. We last checked them against the legislation on 21 October 2026. Every check names the clause it comes from, so you or your council can look it up on legislation.gov.uk.

  • England: the GPDO 2015, Schedule 2, Part 1 Classes A to E and Part 14 Class A.
  • Wales: the GPDO 1995 as it applies in Wales, Part 1 Classes A to E and Part 40 Class A.
  • Scotland: the GPDO (Scotland) 1992, Part 1 Classes 1A to 3A and Part 1A Class 6HA.
  • Northern Ireland: the GPDO (NI) 2015, Part 1 Classes A to D and Part 2 Classes A and B.

The limits marked on the sliders, and “the most you can build”, are found by running the same rules, not written in separately. They always agree with the verdict.

Your home's restrictions

Your postcode is checked against official open data for conservation areas, listed buildings, Article 4 Directions, National Parks, National Landscapes, World Heritage Sites and flood zones. Anything found is ticked for you, and you can change it. Listed status is never ticked automatically, because the data can’t say for certain whether your own home is listed.

The data doesn’t cover every council equally, so if you know of a restriction, tick it. See where the data comes from.

Costs

Costs are our own estimates. Each part of the build has a rate per unit (a square metre, an item or a kilowatt of solar panels) for basic, standard and high finishes, set against published UK cost guides and homeowners' quotes, last checked in September 2026. Labour is scaled to your region using Office for National Statistics pay data for building trades, and VAT is added. The all-in budget also adds professional fees, Building Control and a contingency. They show the saving if you do some of the work yourself. Use them to plan a budget, then get at least three written quotes. Costs need a free account.

What we can't tell you

  • Whether earlier planning permissions for your home removed its permitted development rights. Your council can tell you.
  • Restrictions in your deeds, lease or covenants.
  • Whether you need listed building consent, which is separate from planning permission.
  • Whether your plans will pass Building Regulations. It lists the parts that apply, but approval comes from building control.
  • Anything about flats, maisonettes or buildings that aren’t houses, which have different rules.
  • Changes to the rules after 21 October 2026.

For certainty, apply to your council for a Lawful Development Certificate. Found something wrong? Report a problem with a result.