Does your home project need planning permission?
Check an extension, loft conversion, garden room, solar panels or other home project against the rules for your part of the UK. See the most you can build without permission, what it will cost, and what to do next.
What are you planning?
Pick a project to start with a typical size. You can change any of it.
- ExtensionRear and side, single or two storeys
- Loft conversionDormers, hip to gable and L-shaped
- Garden buildingGarden rooms, offices, sheds and garages
- PorchA porch at an outside door
- RooflightsRoof windows and other roof changes
- Solar panelsOn roofs, walls and balconies, and plug-in kits
- Fence, wall or gateFences, garden walls, railings and gates
- Driveway or pavingFront and back, with any new dropped kerb
- Heat pumpAir source heat pumps: size, position and noise
- Windows and doorsReplacements and new openings, at a house or flat
What you get
This is the real answer for the garden room above, straight from the checker.
Outbuilding (Class E)
No permission needed
Likely permitted development, so no planning application
What to do next
To have it confirmed in writing, apply for a Lawful Development Certificate.
Things to watch
- If your home was created using permitted development rights, such as a barn, office or shop converted without planning permission, it doesn't have these rights, so you'll need planning permission. Your council can tell you how it was approved.(Class E.1(a))
Conditions that apply (2)Raised platforms, Use.
- Decking, a verandah or a platform more than 30cm above the ground isn't permitted development, so plan any deck around the building lower than that.(Class E.1(h))
- It must be used for things incidental to the house, like an office, gym or workshop. Not as a bedroom or a separate home.
Rule checks
All 7 rule checks passed
- Height within 2m of boundary2.3m vs 2.5m max (1m from boundary)
- Eaves height2.3m vs 2.5m max
- Covers ≤ half the garden17.5m² of 135m² garden (13%)
- Not in front of the houseLocated behind the front wall
- Not a listed buildingNo listing recorded
- No Article 4 DirectionNone recorded
- Not in a protected areaNone recorded
A clear answer
Whether your design is permitted development, needs prior approval or needs planning permission, and which rules decide it.
The most you can build
The largest size that stays within the rules for your home, which you can apply to your design in one step.
What it will cost
With a free account: build costs at your region's rates, the saving from doing some of the work yourself, and an all-in budget.
What to do next
The Building Regulations that apply and planning decisions near you. With a free account, party wall notices and a report to print.
How it works
Enter your postcode
PlanItClear looks up conservation areas, listed buildings, flood zones and other restrictions for your home.
Describe your project
Set the size and position with sliders, or measure your house and garden on a map.
Get your answer
The verdict updates as you change the design, with costs and next steps alongside.
Built on the rules themselves
PlanItClear was started by Andrew Barnard, a data analyst and developer, after working out whether a rear extension needed planning permission took weeks of reading. Why PlanItClear exists.
The legislation itself
Each nation's permitted development rules, as amended to 21 October 2026, with the clause behind every check.
Official data
Restrictions and flood zones from government open data, credited on the data sources page.
All four UK nations
England, Wales, Scotland and Northern Ireland each have their own rules, and we check your design against the right ones.
Clear about its limits
It's a screening tool, not legal advice. It says when to check with your council or get a Lawful Development Certificate.
Questions
Anything else? Get in touch.
Is PlanItClear free?
Yes. The answer and the most you can build need no sign-up, and they'll stay free. A free account adds costs, saved designs, a printable report, party wall notices and measuring your plot on a map. Those extras are free while we launch and will become paid later.
What is permitted development?
Permitted development rights let you extend or alter a house without applying for planning permission, within limits on size, height and position. Each UK nation sets its own rules. They don't cover flats, and they can be removed or limited, for example in a conservation area or by an Article 4 Direction.
Can I rely on the answer?
Use it to understand where you stand before you spend money on drawings. It isn't legal advice or a planning decision. For certainty, apply to your council for a Lawful Development Certificate, which confirms in writing that a project doesn't need planning permission.
Which parts of the UK does it cover?
England, Wales, Scotland and Northern Ireland, each against its own rules. Postcodes in England, Wales and Scotland fill in planning restrictions automatically. In Northern Ireland you tick any that apply yourself.
Where do the costs come from?
Each part of the build has a rate per unit (a square metre, an item or a kilowatt of solar panels) for basic, standard and high finishes, set against published UK cost guides and homeowners' quotes, last checked in September 2026. Labour is scaled to your region using Office for National Statistics pay data for building trades, and VAT is added. The all-in budget also adds professional fees, Building Control and a contingency. They're rough ranges to plan with. Get at least three written quotes before you commit.
Do you keep my postcode?
Only if you save a design. Your postcode and design are used to give your answer and stay in the page's address. If you sign in and save a design, it's kept in your account until you delete it. Visits are counted without cookies and without the postcode.
Check your project
It takes a couple of minutes, and the answer needs no sign-up.