What are you building?

Roof alteration (Class C)

Project type
Save design Report

Roof alteration (Class C)

No permission needed

Likely permitted development, so no planning application

What to do next

To have it confirmed in writing, apply for a Lawful Development Certificate.

Things to watch

  • If your home was created using permitted development rights, such as a barn, office or shop converted without planning permission, it doesn't have these rights, so you'll need planning permission. Your council can tell you how it was approved.(Class C.1(a))
Conditions that apply (1)Solar panels.
  • Solar panels have their own rules (Part 14). Choose Solar at the top to check them.

Rule checks

All 5 rule checks passed
  • Protrudes ≤ 15cm from the roof slope10cm vs 15cm max
  • Not above the original ridgeBelow the highest part of the roof
  • No chimney, flue or soil pipeNone
  • Not a listed buildingNo listing recorded
  • No Article 4 DirectionNone recorded

Was this right?

PlanItClear is free while we launch. If it saved you a fee, you can support us.

Support PlanItClear

PlanItClear is a screening tool, not legal advice. Check with your council, or get a Lawful Development Certificate, before you build. Costs are rough ranges. Data sources and licences. Report a problem with this result.

Which rules are checked

In England, the GPDO 2015 Schedule 2, Part 1 Classes A to E and Part 14 Class A, as amended to 27 August 2026. In Wales, the GPDO 1995 as it applies in Wales, Part 1 Classes A to E and Part 40 Class A. In Scotland, the GPDO (Scotland) 1992, Part 1 Classes 1A to 3A and Part 1A Class 6HA. In Northern Ireland, the GPDO (NI) 2015, Part 1 Classes A to D and Part 2 Classes A and B.