Air source heat pump (Part 14, Class G)
Allowed with conditions
Likely allowed, once your installer's noise calculation meets the MCS standard.
What to do next
Ask an MCS-certified installer for the noise calculation. If it meets the MCS standard, the heat pump is likely permitted development, and a Lawful Development Certificate confirms it in writing.
Things to watch
- It's only permitted development if it meets the MCS noise standard. An MCS-certified installer works this out for your nearest neighbour.(Class G.1)
- Place it to affect the look of the house and the neighbours as little as you can, use it for heating and not only for cooling, and take it down when it's no longer needed.(Class G.3)
- It isn't permitted development on a scheduled monument, or with a wind turbine on the house or in the garden.(Class G.2(b), (c), (h))
Rule checks
- Meets the MCS noise standardNot worked out yet
4 other checks passed
- One heat pump on a house that isn't detached1 proposed
- Outdoor unit no more than 1.5m³0.4m³ including any housing
- Not a listed buildingNo listing recorded
- No Article 4 DirectionNone recorded
Was this right?
What your project will cost
Sign in, free, to see build costs at your region’s rates, the saving from doing some of the work yourself, an all-in budget, and whether it’s likely to add value to your home.
Building Regulations
Separate from planning, and needed whether or not you apply for permission. 1 thing needs action.
- GeneralNotifiable workAction needed
Fitting a heat pump is notifiable under Building Regulations. An MCS-certified installer in a competent person scheme certifies it for you, so you don't apply to building control yourself.
- Part PElectrical work
Wiring it in is notifiable electrical work, done or certified by a registered electrician. It's usually part of the installer's job.
- GeneralBoiler Upgrade Scheme
In England and Wales your MCS-certified installer applies for the grant and takes it off your bill.
- GeneralGround source heat pumps
The pipes go underground, so a ground source heat pump usually doesn't need planning permission. Ask your council first near protected trees or on a site of archaeological interest.
PlanItClear is free while we launch. If it saved you a fee, you can support us.
Support PlanItClearPlanItClear is a screening tool, not legal advice. Check with your council, or get a Lawful Development Certificate, before you build. Costs are rough ranges. Data sources and licences. Report a problem with this result.
Which rules are checked
In England, the GPDO 2015 Schedule 2, Part 1 Classes A to E and Part 14 Class A, as amended to 27 August 2026. In Wales, the GPDO 1995 as it applies in Wales, Part 1 Classes A to E and Part 40 Class A. In Scotland, the GPDO (Scotland) 1992, Part 1 Classes 1A to 3A and Part 1A Class 6HA. In Northern Ireland, the GPDO (NI) 2015, Part 1 Classes A to D and Part 2 Classes A and B.