Home extension (Class A) under the Welsh rules
No permission needed
Likely permitted development, so no planning application
What to do next
To have it confirmed in writing, apply for a Lawful Development Certificate.
Things to watch
- Verandas, raised platforms, roof terraces and most balconies aren't permitted development; external wall insulation may project at most 16cm.(Class A.1(l))
Conditions that apply (1)Matching materials.
- Exterior materials must, so far as practicable, match the majority of the existing house.(Class A.3(a))
Rule checks
All 9 rule checks passed
- Rear extension depth ≤ 4m3m vs 4m (all house types)
- Single-storey height ≤ 4m3m vs 4m max
- Below existing roof ridge3m vs 8.5m ridge
- Eaves ≤ existing house eaves2.9m vs 5.2m existing
- Within 2m of boundary: eaves ≤ 3m, height ≤ 4meaves 2.9m, height 3m (0.5m from boundary)
- Covers ≤ half the garden15m² of 235m² garden (6.4%)
- Not a listed buildingNo listing recorded
- No Article 4 DirectionNone recorded
- Not in a protected areaNone recorded
Was this right?
The most you can build
The most you can build without an application: depth 4m, width 7.5m, 30m² floor area.
Yours is 3m by 5m.
What your project will cost
Sign in, free, to see build costs at your region’s rates, the saving from doing some of the work yourself, an all-in budget, and whether it’s likely to add value to your home.
Building Regulations
Separate from planning, and needed whether or not you apply for permission. 2 things need action.
- GeneralBuilding Regulations approval requiredAction needed
Every habitable extension needs Building Regulations approval. Submit Full Plans or a Building Notice before work starts.
- Part AStructural calculations for steel beam (RSJ)Action needed
Opening up an existing external wall needs a structural engineer's calculations for the steel beam, padstones and temporary propping, approved by Building Control before the wall is removed.
- Part LGlazing and insulation (Welsh Approved Document L)
Wales has its own Approved Document L. Large areas of glazing in an extension can need energy calculations. Confirm the limits with building control.
Your neighbours
Under the Party Wall etc. Act 1996 you must give your neighbours written notice before this work.
Notice of adjacent excavation (section 6, at least 1 month’s notice)
The foundations will be dug within 3m of your neighbour's house, and usually deeper than its foundations.
Party structure notice (section 3, at least 2 months’s notice)check if needed
Needed if you'll cut into the shared wall, for example to fit flashing, bear a steel beam or tie in the new walls.
PlanItClear is free while we launch. If it saved you a fee, you can support us.
Support PlanItClearPlanItClear is a screening tool, not legal advice. Check with your council, or get a Lawful Development Certificate, before you build. Costs are rough ranges. Data sources and licences. Report a problem with this result.
Which rules are checked
In England, the GPDO 2015 Schedule 2, Part 1 Classes A to E and Part 14 Class A, as amended to 27 August 2026. In Wales, the GPDO 1995 as it applies in Wales, Part 1 Classes A to E and Part 40 Class A. In Scotland, the GPDO (Scotland) 1992, Part 1 Classes 1A to 3A and Part 1A Class 6HA. In Northern Ireland, the GPDO (NI) 2015, Part 1 Classes A to D and Part 2 Classes A and B.