Do I need planning permission for an extension in Scotland?
Last updated 2 October 2026.
Check your own design
Enter your postcode and sizes to see whether your design is within these rules, and the most you can build.
The limits at a glance
- Single storey within 1m of a boundary, semi-detached or detachedOver 4m needs planning permission.
- Single storey within 1m of a boundary, terracedOver 3m needs planning permission.
- Single-storey heightOver 4m needs planning permission.
Worked out with the same rules as the checker, for a typical design. Your own limits may differ, depending on your home and plot.
Single-storey extensions
- Within 1m of a boundary, it can go no more than 4m beyond the back wall, or 3m on a terraced house.
- More than 1m from every boundary, there’s no fixed depth limit. The other limits still apply.
- The eaves can be no more than 3m high, and no part more than 4m.
Extensions of more than one storey
Every part must be at least 10m from every boundary of the garden. On most plots that rules out a two-storey extension without planning permission.
Rules for every extension
- It can’t be forward of the front of the house, or of a side wall, where that wall faces a road.
- The house can’t become taller than its highest point now, chimneys aside.
- With the extension, the house can cover no more than twice the ground of the original house. Earlier extensions count.
- New building can cover no more than half of the rear garden, and no more than half of the front garden. Scotland counts them separately.
When the rules don't apply
- Conservation areas: extensions need planning permission.
- Listed buildings: you’ll need listed building consent, and normally planning permission too.
- Article 4 Directions and flats: you’ll need planning permission.
National Parks and National Scenic Areas don’t change these rules.
Building warrants
In Scotland an extension needs a building warrant from your council’s building standards service before work starts, and a completion certificate when it’s finished. That’s separate from planning permission.
Common questions
Do I need a certificate to prove my extension doesn't need planning permission?
No, it's optional. A Certificate of Lawfulness of Proposed Use or Development from your council confirms in writing that your plans are within the rules. It costs less than a planning application and is worth having for a bigger project, because a buyer's solicitor may ask for proof when you sell.
Can my neighbours object to my extension?
Not if it's within the permitted development rules: the council doesn't ask them, and there's no decision for them to object to. Separate rights still apply, such as covenants in your deeds and access to shared walls, so talk to them before work starts.
What if I've already built my extension without checking?
If it meets the rules, you don't need to do anything, though a Certificate of Lawfulness of Existing Use or Development proves it. If not, you can apply for planning permission afterwards, and if that's refused, the council can make you change or remove the work. After a number of years the council can no longer act, and the same certificate can confirm that, so ask your council how the time limits apply.
Does a conservatory count as an extension?
Yes. A conservatory or orangery follows the same planning rules as any other extension. A small conservatory may not need a building warrant, depending on its size and how it's separated from the house, so check with your council's building standards service before you build.
Do I need to tell my neighbours before I build?
Not for planning, and the Party Wall etc. Act 1996 doesn't apply in Scotland. Work on a wall you share is governed by your title deeds, so speak to your neighbours, and a solicitor if you need to, before you start.
Elsewhere in the UK
This guide covers Scotland. Each UK nation has its own rules, similar in places but different in the detail.
Other guides
- Do I need planning permission for a loft conversion in Scotland?
- Do I need planning permission for a garden room in Scotland?
- Do I need planning permission for a porch in Scotland?
- Do I need planning permission for rooflights in Scotland?
- Do I need planning permission for solar panels in Scotland?
This guide explains the rules in general. It isn’t legal advice. For certainty about your own project, apply to your council for a Certificate of Lawfulness of Proposed Use or Development.