PlanItClear

Do I need planning permission for solar panels in Wales?

Solar panels on a house in Wales usually don't need planning permission. The Welsh rules cover roofs and walls, with their own limits for flat roofs.

Last updated 2 October 2026.

Check your own design

Enter your postcode and sizes to see whether your design is within these rules, and the most you can build.

Check your design

The limits at a glance

  • On a pitched roof, how far the panels stand outOver 0.2m needs planning permission.
  • On a wall, how far the panels stick outOver 0.2m needs planning permission.
  • On a flat roof, height above the roofOver 1m needs planning permission.
  • On a flat roof, distance from the roof edgeUnder 1m needs planning permission.

Worked out with the same rules as the checker, for a typical design. Your own limits may differ, depending on your home and plot.

On a roof or wall

  • On a pitched roof or a wall, panels can stand out no more than 20cm.
  • They can’t be higher than the highest part of the roof, chimneys aside.
  • On a flat roof, they must be at least 1m from the roof edge and no more than 1m above the roof.
  • Place them to affect the look of the building and the area as little as possible, and take them down when they’re no longer needed.

Balconies and plug-in kits

The Welsh rules cover panels on walls and roofs only, so check with your council before fixing panels to a balcony. There are no specific rules for plug-in solar; a kit on a wall is treated like other wall-mounted panels.

When the rules don't apply

  • Conservation areas and World Heritage Sites: panels can’t go on a front or side wall that faces a road.
  • Listed buildings: panels need listed building consent, and panels on other buildings in the grounds need planning permission.
  • Scheduled monuments: panels aren’t permitted development on the site.
  • Article 4 Directions: check with your council.

Wiring panels into your consumer unit is notifiable electrical work, so use an MCS-certified installer.

Common questions

Do I need a certificate to prove my solar panels don't need planning permission?

No, it's optional. A Lawful Development Certificate from your council confirms in writing that your plans are within the rules. It costs less than a planning application and is worth having for a bigger project, because a buyer's solicitor may ask for proof when you sell.

Can my neighbours object to my solar panels?

Not if they're within the permitted development rules: the council doesn't ask them, and there's no decision for them to object to. Separate rights still apply, such as covenants in your deeds and access to shared walls, so talk to them before work starts.

What if I've already fitted my solar panels without checking?

If they meet the rules, you don't need to do anything, though a Lawful Development Certificate for an existing use or development proves it. If not, you can apply for planning permission afterwards, and if that's refused, the council can make you change or remove the work. After a number of years the council can no longer act, and the same certificate can confirm that, so ask your council how the time limits apply.

Do I need to tell my electricity network operator?

Your installer does it for you. A typical home system can be connected first and reported within 28 days. A larger system, or one with a large battery, needs the network operator's approval before it's connected.

Elsewhere in the UK

This guide covers Wales. Each UK nation has its own rules, similar in places but different in the detail.

Other guides