Do I need planning permission for solar panels?
Last updated 2 October 2026.
Check your own design
Enter your postcode and sizes to see whether your design is within these rules, and the most you can build.
The limits at a glance
- On a pitched roof, how far the panels stand outOver 0.2m needs planning permission.
- On a flat roof, height above the roofOver 0.6m needs planning permission.
- On a wall, how far the panels stick outOver 0.4m needs planning permission.
Worked out with the same rules as the checker, for a typical design. Your own limits may differ, depending on your home and plot.
On a roof
- On a pitched roof, panels can stand out no more than 20cm from the roof slope, and can’t be higher than the highest part of the roof (chimneys aside).
- On a flat roof, they can rise no more than 0.6m above the highest part of the roof.
On a wall or balcony
Panels can stick out up to 40cm from a wall, balcony or roof enclosure, or 20cm where it’s right next to a road.
Plug-in solar kits are covered too, but can’t be fixed to a wooden wall, balcony or enclosure, or to timber cladding. Use a kit sold for use in Great Britain and follow the maker’s instructions.
For every installation
Place the panels so they affect the look of the building and the area as little as possible, and take them down when they’re no longer needed.
When the rules don't apply
- Conservation areas and World Heritage Sites: panels can’t go on a wall, balcony or roof enclosure that faces a road. Roof slopes facing the road are allowed.
- Flat roofs on protected land (conservation areas, National Parks, National Landscapes and World Heritage Sites): ask the council whether it needs to approve how the panels look before you install them.
- Listed buildings and buildings in their grounds: panels need planning permission and listed building consent.
- Scheduled monuments: panels aren’t permitted development on the site.
- Article 4 Directions: check with your council.
Connecting them
Wiring panels into your consumer unit is notifiable electrical work. Use an MCS-certified installer. You’ll need one anyway to be paid for electricity you export under the Smart Export Guarantee. Your installer should check the roof or wall can take the panels and the wind loads.
These are the rules as amended to 21 October 2026. Ground-mounted panels have separate rules.
Common questions
Do I need a certificate to prove my solar panels don't need planning permission?
No, it's optional. A Lawful Development Certificate from your council confirms in writing that your plans are within the rules. It costs less than a planning application and is worth having for a bigger project, because a buyer's solicitor may ask for proof when you sell.
Can my neighbours object to my solar panels?
Not if they're within the permitted development rules: the council doesn't ask them, and there's no decision for them to object to. Separate rights still apply, such as covenants in your deeds and access to shared walls, so talk to them before work starts.
What if I've already fitted my solar panels without checking?
If they meet the rules, you don't need to do anything, though a Lawful Development Certificate for an existing use or development proves it. If not, you can apply for planning permission afterwards, and if that's refused, the council can make you change or remove the work. After a number of years the council can no longer act, and the same certificate can confirm that, so ask your council how the time limits apply.
Do I need to tell my electricity network operator?
Your installer does it for you. A typical home system can be connected first and reported within 28 days. A larger system, or one with a large battery, needs the network operator's approval before it's connected.
Does a home battery need planning permission?
Not if it's inside the house or garage. Wherever it goes, it should be fitted by a competent installer and included in the notice to your electricity network operator.
Elsewhere in the UK
This guide covers England. Each UK nation has its own rules, similar in places but different in the detail.
Other guides
- Do I need planning permission for an extension?
- Do I need planning permission for a loft conversion?
- Do I need planning permission for a garden room?
- Do I need planning permission for a porch?
- Do I need planning permission for rooflights?
- Do I need planning permission for a fence?
- Do I need planning permission for a heat pump?
- Do I need planning permission for a driveway?
- Do I need planning permission for new windows and doors?
This guide explains the rules in general. It isn’t legal advice. For certainty about your own project, apply to your council for a Lawful Development Certificate.