PlanItClear

Do I need planning permission for a heat pump?

Most air source heat pumps on houses don't need planning permission. The outdoor unit has to be within a size limit, placed with care, and quiet enough for the neighbours.

Last updated 12 October 2026.

Check your own design

Enter your postcode and sizes to see whether your design is within these rules, and the most you can build.

Check your design

Is your home protected?

In a conservation area a heat pump can't go on a wall or roof facing a road, or nearer the road than the house, and on a listed building it always needs planning permission. Enter your postcode to see whether you're in a conservation area or an Article 4 Direction, and the listed buildings nearby. Then read what each direction covers.

Check your postcode

Air source heat pumps

  • Size: the outdoor unit, including its housing, can be no more than 1.5m³.
  • How many: one on a house, or two on a detached house, counting any already there.
  • Noise: it must meet the MCS planning standard for noise. An MCS-certified installer checks this with a calculation for your nearest neighbour.
  • Position: not on a pitched roof, and on a flat roof at least 1m from the edge. On a wall facing a road, no higher than the ground floor. Place it to affect the look of the building and the area as little as possible.
  • Not used only for cooling, and taken down when it’s no longer needed.

These rules were relaxed in 2025. The old rule keeping a unit at least 1m from the boundary has gone.

When the rules don't apply

  • Conservation areas and World Heritage Sites: not on a wall or roof that faces a road, or nearer the road than the house.
  • Listed buildings and scheduled monuments: you’ll need planning permission, and listed building consent for a listed home.
  • Article 4 Directions: check with your council.

Ground source heat pumps

The pipes go underground, so a ground source heat pump for a house usually doesn’t need planning permission. Trenches or boreholes near protected trees, or on a site of archaeological interest, need care, so ask your council first.

Grants and installers

The Boiler Upgrade Scheme gives a grant towards a heat pump in England and Wales. Your installer claims it for you, and must be MCS-certified. Check the current amount on GOV.UK.

Common questions

Do I need a certificate to prove my heat pump doesn't need planning permission?

No, it's optional. A Lawful Development Certificate from your council confirms in writing that your plans are within the rules. It costs less than a planning application and is worth having for a bigger project, because a buyer's solicitor may ask for proof when you sell.

Can my neighbours object to my heat pump?

Not if it's within the permitted development rules: the council doesn't ask them, and there's no decision for them to object to. Separate rights still apply, such as covenants in your deeds and access to shared walls, so talk to them before work starts.

What if I've already fitted my heat pump without checking?

If it meets the rules, you don't need to do anything, though a Lawful Development Certificate for an existing use or development proves it. If not, you can apply for planning permission afterwards, and if that's refused, the council can make you change or remove the work. After a number of years the council can no longer act, and the same certificate can confirm that, so ask your council how the time limits apply.

What if my neighbour complains about the noise?

A unit that met the noise standard when it was fitted is within the planning rules, but the council can still act on a noise nuisance. Keep your installer's noise calculation, have the unit serviced, and ask about anti-vibration mounts or a screen if it's louder than expected.

Can I have a heat pump in a flat?

A block of flats can have one air source heat pump under permitted development, with an outdoor unit of up to 0.6m³. You'll need the freeholder's permission to fix it to the building, and we don't check heat pumps for flats yet, so ask your council if you're unsure.

Does a heat pump need Building Regulations approval?

Fitting one is notifiable work under Building Regulations, which an MCS-certified installer in a competent person scheme can certify for you. Wiring it in is notifiable electrical work too.

Elsewhere in the UK

This guide covers England. Each UK nation has its own rules, similar in places but different in the detail. There are no guides on this for the other nations yet, so check with your council.